Hotraco Industrial has recently implemented the who control installation of the previous Palace of Justice at Utrecht. The existing building is divided into three sections for three new users, each with their own specific application, requirements and wishes.

In relationship with certain existing parts, the selected hardware platform was Satchwell control equipment in combination with TAC field equipment. The old building has now received three separate control installations. Due to the interconnection of these installations, the remote management has been made simple.
Stationsstraat 142
5963 AC Hegelsom
The Netherlands
P.O. Box 6086
5960 AB Horst
The Netherlands
T +31 (0)77 327 5050
F +31 (0)77 327 5051
E isolutions@hotraco.com